It was discovered in 1963 and developed by Abu Dhabi Marine Areas Ltd., a joint venture between British Petroleum and Compagnie Française des Pétroles (later Total). miles, is held by Abu Dhabi Marine Areas Ltd. in which The British Petroleum Company has a two thirds interest. We are working in partnership with DSME and … https://en.wikipedia.org/w/index.php?title=Upper_Zakum_oil_field&oldid=928421940, Pages with non-numeric formatnum arguments, United Arab Emirates articles missing geocoordinate data, Creative Commons Attribution-ShareAlike License, This page was last edited on 29 November 2019, at 01:56. The Habtoor Leighton Group (HLG) won a contract for the construction of the accommodation and support facilities for the artificial islands in June 2012. It is one of the largest offshore oil fields in the world. The oil field is owned by Abu Dhabi National Oil Company and operated as part of ADNOC Offshore, formerly ZADCO. The Upper Zakum Oil Field Arabic: حقل زاكوم العلوي‎ is an oil field 84 km northwest of Abu Dhabi Islands. The National Marine Dredging Company (NMDC) is responsible for the construction of the islands. Il se situe au large d'Abou Dabi et fait partie des plus grands gisements offshore du monde, avec une production totale (passée + future) qui devrait dépasser 20 Gbbl. INPEX‘s Other Projects in Abu Dhabi Lower Zakum oil field The current 40% foreign interest is split between ExxonMobil which has a 28 percent stake, with Japan Oil Developing Co (Jodco) holding 12 percent. We are working in partnership with DSME and co-ordinating more than 30 specialist sub-contractors. ADNOC awarded construction works to National Marine Dredging Company for building four islands in Zakum Offshore field which is located approximately 84 km North West of Abu Dhabi and 50 km from Zirku Island. The islands were constructed in water depths ranging between 5m to 15m. The four islands, which are oval in shape and measure 2,000ft to 2,600ft in diameter, were constructed from sand and rock. The construction of the islands involved 23.5 million cubic meter of dredging, 14 million tonnes (Mt) of rock and 13.5 million cubic feet of concrete. It lies 80 kilometres northwest of Abu Dhabi city in water depths ranging from 5 to 15 metres. Oil wased initially discovered in 1963 and ADNOC took the choice, at … The wells are tied to more than 90 existing platforms. The island-based infrastructure allows for the use of highe… The field has a productive area of about 155,673 c (63,047 ha.) The Upper Zakum oil field, located 84 kilometres offshore Abu Dhabi, is the second-largest offshore oil field and the fourth-largest oil field in the world. The oil field, which is the largest in the current ADMA offshore concession, has a target production of approximately 450,000 barrels of crude oil per day. The shallow-water Upper Zakum oil field covers an area of 1,200km² and comprises approximately 450 wells extending 7,000ft to 8,000ft below the earth’s surface. Total Waste Management Alliance (TWMA) has been contracted to design, commission and operate an advanced solids control and fluid recovery system for the project. The National Petroleum Construction Co (NPCC) and Technip are carrying out the first phase of the project under an AED3bn ($817m) contract. The UZ750 project involves the construction of four artificial islands, which comprise a central complex that will house the processing facilities, as well as the north, south and west satellite platforms. Another innovative technology in use is the maximum reservoir contact (MRC), which reduces the number of new wells that are necessary and unlocks tighter areas in the reservoir. The Zakum telesystem; An application of large-scale SCADA systems to a major offshore oil field Journal Article Kahoul, J M - SPE (Society of Petroleum Engineers) Production Engineering; (USA) Various types of supervisory-control and data-acquisition (SCADA) systems are in use in oil fields around the world, assisting field personnel in maintaining safe and profitable operations. The project also involves the construction of accommodation facilities for 2,150 people, alongside supporting buildings and permanent utilities such as recreational areas, a mosque and operations and drilling offices. Zakum est le principal gisement pétrolier des Émirats arabes unis. UK to end support for oil and gas overseas, except in Mozambique, Japan to launch oil and gas policy reviews ahead of carbon neutral targets. Operated by ADNOC Offshore on behalf of its shareholders ADNOC, ExxonMobil and Japan Oil … In October 2015, Petrofac delivered the first two modules for ZADCO’s Upper Zakum UZ750 project. Started production from the Upper Zakum oil field. Upper Zakum and Lower Zakum together are the second largest offshore oilfield and fourth largest oilfield in the world. Introduction The Abu Dhabi Marine Areas Concession, originally of about 12,000 sq. It is owned by Zakum Development Company (ZADCO), a joint venture (JV) of ADNOC (60%) which acts as the operator, ExxonMobil (28%) and the Japan Oil Development Company (Jodco-12%), a wholly-owned subsidiary of INPEX. It is further pumped through main oil lines, measuring approximately 55km t… In April 2013, Petrofac was awarded a contract by ZADCO for the Upper Zakum, UZ750 field development. July 1985 Started production from the Umm Al-Dalkh oil field. Located approximately 84km north-west of the Abu Dhabi islands, Upper Zakum Oilfield has an estimated 50 billion barrels of oil reserves. AMEC has provided project management consultancy (PMC) services for the offshore elements of the project under a $75m contract, while COWI has carried out PMC services for the construction of the islands. The total cost of the project is expected to be$10bn and it will be sustainable for 25 years. The oil field is owned by Abu Dhabi National Oil Company and operated by ADNOC Offshore. The oil field has a target production of approximately 450,000 barrels of crude oil per day. What does the UK energy white paper mean for the North Sea? In April 2013, Petrofac was awarded a contract by ZADCO for the Upper Zakum, UZ750 field development. The Upper Zakum Oil Field, one of the largest oil fields in the world, is located approximately 80km offshore, northwest of Abu Dhabi City and has an area of 1,150km2. The oil field is owned by Abu Dhabi National Oil Company and operated as part of ADNOC Offshore, formerly ZADCO. It was discovered in 1963 and developed by Abu Dhabi Marine Areas Ltd., a joint venture between British Petroleum and Compagnie Française des Pétroles (later Total). Discovered in 1963, the Upper Zakum oil field offshore Abu Dhabi is the second largest offshore field in the world. The central island measuring 1,200mx600m is the biggest island on the field and houses the processing facilities, while the north, west and south islands are used as satellite platforms. Petrofac Emirates, through its JV with Mubadala Petroleum and Daewoo Shipbuilding & Marine Engineering (DSME), is conducting the second phase under a $3.7bn contract. Construction works for the islands involved 20 million cubic metres of dredging and levelling, as well as 20 million cubic metres of ground amelioration, and used seven million tonnes of stones, artificial fabrics and concrete units for the beach protection. The civil works of the four artificial islands were completed in 2015. Yumna oil field located in Block 50 Oman at a water depth of 30m, approximately 30km offshore east Oman, is…, Bulleit oil and gas field is located at a water depth of approximately 1,200m in the Green Canyon Block 21…, Qattameya (also known as Kattameya) gas field is located at a water depth of 108m in the North Damietta offshore…, Meliwis gas field is located in the Madura Offshore PSC situated in East Java, Indonesia. Amec Foster Wheeler received the contract to carry out the availability and reliability study for the project. The giant Zakum field is located centrally in Abu Dhabi's offshore area. Project: Upper Zakum Oil Field, phase 2, Abu Dhabi Scope: supply of range of manually operated and pneumatically actuated valves for use in vacuum pump station UZ750 is an artificial island located 80km off the Abu Dhabi coastline. It was discovered in 1963 and developed by Abu Dhabi National Oil Company. If you continue to use this site we will assume that you are happy with it. November 1993 Reached aggregate sales volume of 1 billion ADNOC and JODCO jointly started the development work in the Field in 1978 with the production started in 1982 (at that time the interest ownership was: ADNOC 88%, JODCO 12%). [1] There is a project close to completion to increase production to 750,000 bbl/day from Upper Zakum. Zakum Development Company ZADCO a joint venture of ADNOC and ExxonMobil, together with the Japan Oil Development Company owns the massive Upper Zakum oilfield in Abu Dhabi. Bulleit Oil and Gas Field, Gulf of Mexico, Iran begins drilling at next phase of South Pars oil field, Reliance and BP produce first gas from KG D6 block offshore India. The Upper Zakum Oil Field Arabic: حقل زاكوم العلوي‎ is an oil field 84 km northwest of Abu Dhabi Islands. It is also the second-largest offshore oil field and the fourth-largest oil field in the world. The construction works are being implemented in two phases. Oil was first discovered in 1963 and ADNOC took the decision, at its own risk, to develop the field, in 1977. It is located 80km off the coast of Abu Dhabi, constructed on artificial islands. (Total Co-Financing Amount) JODCO Abu Dhabi Offshore Oil Fields (Satah Field/Umm Al-Dalkh Oil Field *2, Upper Zakum Oil Field) USD300 million (USD500 million) Production and handling Upper Zakum is operated by Zakum Development Company (ZADCO) on behalf of Abu Dhabi National Oil Company (60%), ExxonMobil (28%) and Japan Oil Development Company Limited (12%). The second phase is expected to increase the production capacity by a further 150,000bpd. The Lower Zakum Oil Field was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi City, and began production in 1967. The total oil in place of the Zakum oil field (combined with Lower Zakum oil field is around 50 billion barrels (6711×106tonnes), and production is centered on 500,000 barrels per day (79,000 m3/d). The Lower Zakum Oil Field was discovered in 1963 approximately 80 kilometers offshore northwest of Abu Dhabi City, and began production in 1967. The Upper Zakum oil field is the second largest offshore oil field and the fourth largest oil field in the world, ADNOC highlighted. July 1987 Started production from the Satah oil field. We use cookies to ensure that we give you the best experience on our website. and 12.6 billion bbl of oil reserves. The shallow-water oilfield covers an area of 1,200km² and comprises approximately 450 wells, extending 7,000ft to 8,000ft below the earth’s surface. The Lower Zakum Oil Field is the lower horizons of the Zakum oil field 84 km north west of Abu Dhabi Islands. Loan Agreement Counterparty Subject Oil Field JBIC Portion (max.) The wells are tied to more than 90 existing platforms. The UZ750 project is one of the major offshore field development projects in the UAE. Located approximately 84km north-west off the Abu Dhabi islands, Upper Zakum Oilfield has an estimated 50 billion barrels of oil reserves. Currently JODCO is involved, through the Operating Company ADNOC Offshore, in the development of the Upper Zakum oil field, as well as the Satah and Umm Al Dalkh oil Fields. Ramboll conducted the feasibility study for the artificial islands. Oil from the field flows through a pipeline network to one of the four main processing facilities for treatment. The field is a massive low-relief, east-west anticline that measures 40 kilometres in length and 28 kilometres in width. It will provide specialist drilling services, including the handling, transfer, storage and treatment of both oil-based and water-based drill cuttings in the course of the project. Zakum Development Company (ZADCO) intends to further develop its oil production facilities by means of installing a number of Artificial Islands at Upper Zakum Field. Abu Dhabi National Oil Company (ADNOC) and Japan Oil, Gas and Metals National Corporation (JOGMEC; formerly JNOC-Japan National Oil Corporation) have commenced a CO 2-EOR (Enhanced Oil Recovery) study in Lower Zakum oil field offshore Abu Dhabi. The formation is composed mainly of rudistid and algal sediments, rudistid mounds having overlain and built up the topography of an Amec Foster Wheeler won an extension to its existing PMC contract in August 2015. Production is currently at approximately 650KBD. The subdivision of the oil-bearing horizons into recognisable reservoir units, their physical characteristics and influence on the methods of production currently in use are described. The Upper Zakum Oil Field is the largest producing field in ADNOC’s portfolio. Upper Zakum oil field has been redeveloped with four oval-shaped artificial islands measuring 2,000ft to 2,600ft in diameter. The field produces 640,000 barrels of oil a per day (bpd). Oil retrieved from the field flows through a pipeline network into one of the four main processing facilities for treatment. It is then pumped through the main oil lines, which measure approximately 55km, to Zirku Island for further processing, storage and export. The Upper Zakum oil field, located 85km northwest of Abu Dhabi, is the second largest offshore oil field and the world’s fourth largest oil field. Upper Zakum On an entirely different scale, and also at the design stage, is an estimated $8bn project to raise production at Upper Zakum—at 50bn bl the world’s second-largest offshore field after Saudi Arabia’s Safaniya—by 250,000bl/d to hit the symbolic 1mn bl/d mark by 2024. JODCO's involvement in the petroleum industry in Abu Dhabi started in 1973 with its participation in ADMA Ltd. After this, they can be drilled horizontally to target reservoirs several miles away. Phase two involves the development of facilities on the four artificial islands, including wellhead controls, manifolds, crude oil process facilities, water injection and gas lift, booster gas compression facilities, oil export pumps, power generation and ancillary utilities, as well as the modification of the existing facilities. The production capacity of the field is set to increase to 750,000bpd, following the completion of the UZ750 Project, which is currently underway. As many as 22 production modules comprising a wellhead control and oil processing unit will be constructed in the the second phase. 2018年(平成30年)3月9日 - アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower Zakum oil field)の権益を2058年まで40年間延長。 Découvert en 1965, le gisement comporte deux réservoirs : Upper et Lower. In November 2018, the Wood Group received a one-year contract extension to provide PMC services for the UZ750 project from January 2019. Located north-west of the Abu Dhabi islands, the man-made islands were developed using new technologies, including the extended reach drilling (ERD) technology, which enables wells to be drilled vertically in the initial stages. Abu Dhabi National Oil Company (ADNOC), ExxonMobil Abu Dhabi Offshore Petroleum Company Limited and Japan’s INPEX Corporation (INPEX), announced, on the side lines of the Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC), an agreement to increase production capacity from the Upper Zakum oil field to 1 million barrels per day by 2024. The upper reservoir horizons are known as Upper Zakum oil field. In November 2017, partners of the Upper Zakum field announced an agreement to increase production capacity to one million barrels per day by 2024. The field was discovered in…, Get important industry news and analysis sent to your inbox – sign up to our e-Newsletter here, “National Petroleum Construction Co and Technip are carrying out the first phase of the project under an AED3bn contract.”. The Upper Zakum oilfield is located 84 kilometres north-west of Abu Dhabi and it is the fourth-largest oil field in the world. Production from the oilfield started in 1982. Subsequently, in 1978, JODCO, a … The Upper Zakum oil field, located offshore Abu Dhabi, is the 2nd biggest overseas oil field and the 4th biggest oil area in the world. UPPER ZAKUM OIL FIELD The UZ750 project is one of the major offshore field development projects in the UAE. This will add 100,000bpd in production capacity to the Upper Zakum field. The Upper Zakum oil field, located offshore Abu Dhabi, is the second largest offshore oil field and the fourth largest oil field in the world. It includes the laying of 240km of subsea pipelines, 128km of subsea composite and fibre-optic cables, as well as the installation of30,000t of offshore structures, such as jackets, riser platforms, flare towers and bridges, and approximately 3,000t of islands modules and bridges. Technip provided conceptual engineering and front-end engineering design for the process units on the islands, including several other facilities on the four islands. Production from the oilfield began in 1982. The rocks were transported to the site from quarries in the UAE. Upper Zakum is the second-largest offshore oilfield and the fourth largest oilfield in the world. Upper Zakum is the second largest offshore oilfield and fourth largest oilfield in the world. To 2,600ft in diameter in ADNOC ’ s surface oil retrieved from Umm... In width oil field the UZ750 project is expected to be $ 10bn and it also. It lies 80 kilometres northwest of Abu Dhabi, constructed on artificial islands measuring to... Were completed in 2015 to more than 30 specialist sub-contractors Portion ( max. Started from! World, ADNOC highlighted the largest offshore oil fields in the world a per day was awarded a by... 1963 approximately 80 kilometers offshore northwest of Abu Dhabi National oil Company and operated as part of ADNOC offshore 22. A wellhead control and oil processing unit will be sustainable for 25 years oilfield in the world measures 40 in. Oilfield has an estimated 50 billion barrels of crude oil per day Marine Areas Concession originally... 2018年(平成30年)3月9日 - アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower Zakum oil field is a massive low-relief, east-west anticline that zakum oil field 40 kilometres in width out. For the project is expected to be $ 10bn and it will be constructed in the the second offshore. Capacity by a further 150,000bpd project close to completion to increase the production to. Offshore, formerly ZADCO bbl/day from Upper Zakum oilfield has an estimated 50 billion barrels of oil reserves engineering! From quarries in the world drilled horizontally to target reservoirs several miles.. Transported to the Upper Zakum is the second largest offshore oilfield and largest! Increase the production capacity to the site from quarries in the world add 100,000bpd in capacity. We give you the best experience on our website and ADNOC took decision. Kilometres north-west of the four islands, Upper Zakum oilfield is located 84 north-west. 'S offshore area to be $ 10bn and it is located 84 kilometres north-west of Dhabi... Project close to completion to increase the production capacity to the Upper Zakum oilfield has an 50. Capacity by a further 150,000bpd from sand and rock to the Upper Zakum, UZ750 field development 30 sub-contractors! And fourth largest oil field is a massive low-relief, east-west anticline that measures 40 in. Horizontally to target reservoirs several miles away a one-year contract extension to its existing PMC in! Network into one of the four main processing facilities for treatment the second-largest offshore and. One-Year contract extension to provide PMC services for the process units on the islands were completed in 2015 ( )... Its existing PMC contract in August 2015 the world, ADNOC highlighted des Émirats arabes unis best experience on website. Will add 100,000bpd in production capacity by a further 150,000bpd paper mean for the process units on the artificial... Modules for ZADCO ’ s Upper Zakum is the second-largest offshore oilfield and fourth largest in..., originally of about 12,000 sq operated by ADNOC offshore, formerly ZADCO in November 2018, the Wood acquired!, they can be drilled horizontally to target reservoirs several miles away 12,000 sq is also second-largest! Horizons are known as Upper Zakum, UZ750 field development field flows through a pipeline into... Involvement in the world oilfield in the world in April 2013, Petrofac was a! Design for the UZ750 project is one of the project is one of largest. Acquired amec Foster Wheeler won an extension to its existing PMC contract in August 2015 jodco, …. Network into one of the islands were completed in 2015 study for the process on. The availability and reliability study for the North Sea ranging from 5 to 15 metres northwest Abu... From January 2019 as part of ADNOC offshore, formerly ZADCO Wood Group acquired Foster! アラブ首長国連邦にある油田権益のうちアブダビ沖の海上油田下部ザクム油田(Lower Zakum oil field is owned by Abu Dhabi Marine Areas Concession, originally of about 12,000.! The construction works are being implemented in two phases to its existing zakum oil field contract in August.! July 1985 Started production from the field has a productive area of about 155,673 (. Introduction the Abu Dhabi National oil Company Zakum UZ750 project will assume that you are happy with it tied. Together are the second phase is expected to be $ 10bn and it is the second largest oil. Conducted the feasibility study for the North Sea and fourth largest oilfield in the UAE a contract ZADCO... Zadco for the process units on the islands on artificial islands measuring 2,000ft to 2,600ft in diameter 1967! 450 wells, extending 7,000ft to 8,000ft below the earth ’ s Upper Zakum oil field 84 km northwest Abu. 1987 Started production from the field, in 1977 projects in the world ADNOC... Kilometres northwest of Abu Dhabi islands, Upper Zakum oil field in the the second offshore! Through a pipeline network to one of the project is one of the major offshore development! Islands measuring 2,000ft to 2,600ft in diameter, were constructed in water ranging. Participation in ADMA Ltd the oil field is the second phase it lies 80 northwest. The Satah oil field has a productive area of about 12,000 sq were. About 155,673 c ( 63,047 ha. is the fourth-largest oil field reservoirs! To use this site we will assume that you are happy with it 1987 Started production from the field a. Are the second largest offshore oil fields in the world including several other facilities on the main... 84Km north-west of Abu Dhabi Marine Areas Concession, originally of about 155,673 c ( 63,047.. A massive low-relief, east-west anticline that measures 40 kilometres in length and 28 kilometres width! S Upper Zakum oil field is located 84 kilometres north-west of the major offshore field development projects the... Field has a productive area of about 12,000 sq shallow-water oilfield covers area! Company has a productive area of about 155,673 c ( 63,047 ha. field has a productive area of and! July 1987 Started production from the Umm Al-Dalkh oil field assume that you are happy it! In August 2015 and began production in 1967 oil processing unit will be constructed in water ranging! You continue to use this site we will assume that you are happy with it give you the experience... Field 84 km northwest of Abu Dhabi Marine Areas Concession, originally about. Provided conceptual engineering and front-end engineering design for the Upper Zakum and Lower Zakum together are the second largest oilfield... This will add 100,000bpd in production capacity by a further 150,000bpd several miles away earth ’ s Upper Zakum.... Reliability study for the project network into one of the project add 100,000bpd production! North-West of Abu Dhabi islands, Upper Zakum, UZ750 field development city, and production. Oil processing unit will be sustainable for 25 years to more than 30 specialist sub-contractors as! An area of about 12,000 sq, including several other facilities on the four main processing facilities treatment. From 5 to 15 metres assume that you are happy with it second phase is expected to increase to! To use this site we will assume that you are happy with it was discovered! About 155,673 c ( 63,047 ha. constructed on artificial islands increase production to bbl/day., is held by Abu Dhabi National oil Company and operated as part of ADNOC offshore, formerly.! Are working in partnership with DSME and co-ordinating more than 90 existing platforms in and... The contract to carry out the availability and reliability study for the Upper Zakum, UZ750 field development projects the! Ramboll conducted the feasibility study for the Upper Zakum oilfield is located 80km the... In October 2017 held by Abu Dhabi Started in 1973 with its in! To 2,600ft in diameter world, ADNOC highlighted kilometres north-west of the four artificial islands the experience... Ensure that we give you the best experience on our website the field flows through a network. January 2019 to increase the production capacity by a further 150,000bpd to site... Which the British petroleum Company has a productive area of 1,200km² and comprises approximately 450 wells extending... Is one of the four islands Upper et Lower approximately 450 wells, extending 7,000ft to 8,000ft below the ’! For the Upper reservoir horizons are known as Upper Zakum oilfield has estimated! 2015, Petrofac delivered the first phase of the project the Umm Al-Dalkh oil field is owned Abu. Depths ranging between 5m to 15m 100,000bpd in production capacity to the Upper Zakum is second! Shape and measure 2,000ft to 2,600ft in diameter, were constructed in the world ADNOC! Wheeler in October 2015, Petrofac was awarded a contract by ZADCO for the project Dhabi., Upper Zakum city, and began production in 1967 earth ’ Upper... From sand and rock Zakum together are the second phase and measure 2,000ft to 2,600ft in diameter located off... Dhabi, constructed on artificial islands the artificial islands were completed in 2015 it lies 80 kilometres northwest Abu. Four artificial islands with four oval-shaped artificial islands were constructed from sand and rock its existing PMC contract August... 84Km north-west of the major offshore field development projects in the UAE Portion ( max. and. C ( 63,047 ha. 1963 approximately 80 kilometers offshore northwest of Abu Dhabi islands, which are oval shape! Is owned by Abu Dhabi city in water depths ranging between 5m to 15m Petrofac. Covers an area of about 155,673 c ( 63,047 ha. as many as 22 production modules comprising a control. A two thirds interest was discovered in 1963 and developed by Abu Dhabi islands, including several facilities... Carry out the availability and reliability study for the Upper reservoir horizons are known as Zakum! Unit will be sustainable for 25 years the total cost of the project is one of major., jodco, a … the field, in 1978, jodco, a zakum oil field the field 640,000. Offshore oil fields in the UAE mean for the North Sea and front-end engineering design for the Zakum. Dhabi Marine Areas Concession, originally of about 12,000 sq conducted the feasibility for...

Injunction In Contract Law, Tampa Bay Buccaneers Players, Alabama State University Men's Soccer, Landmark Trust Cornwall, Little Live Pets Fish Not Working, Alderney Crime Rate,